Application
Click: Source:Zhengneng Technology
The transformer to be measured | ES1001 ammeter placed aside waiting for measurement |
After the ES1000 is taken out | Click the red POWER button to boot |
Connect 60KV telescopic insulation rod | Press the PEAK button to test |
Plug directly into the transformer input end | After pulling out, then read, the current was 2.82A |
Retract the insulation rod and press the POWER button to end the measurement. | Let a LOGO of the current of the south retain the memory |