On-site image of Southern Power Grid Guangdong Shenzhen Bran

Click:       Source:Zhengneng Technology

  On December 7th, 2015, We were very pleased to cooperate with China Southern Power Grid Shenzhen Branch again. They wanted to choose an ES1000 high voltage clamp ammeter or an ES1001 wireless high voltage clamp ammeter, which was suitable for their use.Therefore, we will use two kinds of meters to test. The customer found that some transformers have too much zero-sequence current, three-phase load imbalance, etc., which leads to large power loss. In some areas, there are frequent trips. They decided to purchase the ES1001 wireless high voltage clamp ammeter to measure the current at the incoming end to analyze and solve the problem.
 
The transformer to be measured ES1001 ammeter placed aside waiting for measurement
After the ES1000 is taken out Click the red POWER button to boot
Connect 60KV telescopic insulation rod Press the PEAK button to test
Plug directly into the transformer input end After pulling out, then read, the current was 2.82A 
Retract the insulation rod and press the POWER button to end the measurement. Let a LOGO of the current of the south retain the memory

上一篇:On-site image of Southern Power Grid Power Supply Bureau use

下一篇:On-site image of China Southern Power Grid Guangdong Branch


Legal notices Contact Us About US ©Guang Zhou ZhengNeng Electronic Technology Co., Ltd. All rights reserved  粤ICP备15057403号-6      Tel:020-37319325